Using GreenHopper (JIRA v4.2.2-b589#589) we have Sub-tasks of stories. The way our stories have worked out we would like tio link a subtask to multiple stories rather than having to generate multiople sub tasks where is does not make sense. Is there any way to have the same sub task showing/associated with multiplie stories?
--
Post by boardtc - online at:
http://forums.atlassian.com/thread.jspa?forumID=46&threadID=54208
f***@atlassian.com
2011-05-25 20:19:17 UTC
Permalink
No. A sub-task is part of a top level issue, there's no logical way for it to be a sub-task in more than one.

The only thing you could do really is add links to the other tasks you want as related tasks.
--
Post by broughn2 - online at:
http://forums.atlassian.com/thread.jspa?forumID=46&threadID=54208
f***@atlassian.com
2011-05-25 21:51:01 UTC
Permalink
Indeed. Perhaps this could be considered as an addition in a later release.
--